Construction Update 2017

Scroll down to see the beginning construction of Phase 2.

roadConstruction7571-6xx
This picture shows the new road, soon to open, under construction for the Final Phase.
signage23nov17-600
Huge smiles as they are pointing at the next Block of homes to start in the Spring.
Only one Lot left in this block.  Don't miss out if you want to move in , in 2018.
panoNewwork 2291-6xx
This picture is a panoramic view of the whole site
Sanitary sewer and catch basin construction
Catch basin & piping for sanitary sewers.
Constructing sanitary sewers and catch basin
Early image of construction on Phase2
The above picture shows the installation of the sewer pipe.
Early image of construction on Phase2
Covering the first section of sewer pipe and preparing for another length.
Early image of construction on Phase2
Materials arriving at the site for installation of the sewers, and storm sewers and water.
Early image of construction on Phase2
Property is now prepared for extension of the roadway and installation of the services.
Early image of construction on Phase2
Merner was onsite today to begin the excavating of the 2nd phase and it couldn’t be a better day to start. Here we can see a swath that has been constructed to locate where the services will be running from the end of the first Phase north to Paul Bunyan Rd.
image2-61
Clearing some of the brush, where new homes will be built.
image3-66
Here is Pat, Lindsay and Bill taking a close up view of the Excavating.
image4-70
Here we see Lindsay, John & Bill all part of the Supervising Team
 

The Aspen Townhome

Meadow Townhome

The Birch Townhome

Columbine Townhome

The Cottonwood Townhome

Rosewood Townhome

The Maple Townhome

Trillium Townhome